Semel District Water Division
Subordinate to directorate of water outskirts duhok governorate
Today On (21/1/2023)
The aforementioned division has completed works of:-
1- A water pipe with a size of(90)mm was repaired in (tanahi)complex,a pipe of(125)mm type(polyethylene)was repaired in(semel)district,and a pipe with a size of(90+75+125)mm type(polyethylene)was repaired in(msirik)complex.
2- (80)kilograms of(chlorine powder)were distributed to(dulba)village’s well and(zanku)neighborhood’s well thst subordinate to semel district,and a(chlorine machine)was changed for (muqbl)village’s well.
3- a pipe was installed with a size of(125)mm and type(polyethylene)and length(100)m,and a lock was installed with a size of(3)inches in semel district,and two pipes with a size of(3+4)inches were repaired in batel sub-district.
4- A (conductor)with a size of(100)ampere was chaned with a(push button)for well numbered(4)in(shkafdl)village.
5- A clamp with a size of(95)mm was changed for well number(1)in(khrab kulke)neighborhood that subordinate to msirik complex,and a pipe was repaired with a size of(125)mm in tanahi complex.
6- A pipe with a size of (1,5) was repaired in(hajri)neighborhood,a pipe was repaired with a size of(110)mm in(kevla)village,a pipe with a size of(75)mm was repaired in(shahidan)neighborhood in semel district,and a lock was repaired with a size of(6)inches in(hawshke).