The aforementioned division has completed works of:-
1- (300)m of water network and(150)m of(polyethylene)pipe with a size of(75)mm size were installed, and(150)m of pipe with a size of(63)mm were installed in(Ek Mala)village in Ruviya sub-district and (Banenan)complex that subordinate do Daratu sub-district to connect water to a number of new homes in the aforementioned areas.
2- A submersible kit for the well numbered(1 Badil)were installed in(Dliegan)village which consists of a motor(22 kw), a pump sp60-12, an electric board, 9 galvanized pipes with a size of(4)inches and(100)m of cable.
3- A number of galvanized pipes were installed and increased for a number of wells(3 pipes with a size of(4)inches for well numbered(5)in(Khelke)neighborhood in the center of bardarash district,and 3 pipes with a size of(3)inches for well numbered(2)in the center of ruviya sub-district).
4- A water network was maintenanced in(Zmzmuk,gogar,730 neighborhood)village in the center of Bardarash district.
5- An electrical board was maintenanced for the well numbered(4,19)in the center of Bardarash district.