Semel District Water Division
Subordinate to directorate of water outskirts duhok governorate
Today On (28/11/2022)
The aforementioned division has completed works of:-
1- A pipe with a size of(125)mm type(polyethylene)was repaired in the center of semel district and (Kevla)village, and a pipe with a size of(3)inches type(iron)was repaired in(se Grka)neighborhood, and a water pipe with a size of(75)type(polyethylene)was repaired in(Shahidan)neighborhood.
2- (6)samples were delivered for the purpose of testing them in the laboratory of directorate of water outskirts duhok governorateAnd, and(40)kg of(chlorine powder)were distributed in(Khanke)water project.
3- A pipe with a size of(4)inches was repaired(Sinaa)neighborhood, and a water line with a size of(75)mm type (polyethylene) was replaced in Semel district.
4- (4) tons of salt were provided from the stores of Faida’s water division for(Khanke)water project that subordinate to the mentioned division, and the salt machine was cleaned in(Khanke)water project.
5- (500)meters of(75)mm pipe were installed in(Kawashi)neighborhood that subordinate to Semel district, and a pipe with a size of(4)inches type(iron)was repaired in(Av Zrike)village.
6- A pipe with a size of(75)mm type(polyethylene)was repaired(Lazaka)neighborhood that subordinate to(Misirike)complex,and a pipe with a size of(75)mm type(polyethylene)was repaired in(Khrab Kulke)neighborhood that subordinate to(Misirike)complex,and a pipe with a size of(2)inches was repaired in(Zozan)neighborhood in the center of Semel district,and a lock with a size of(4)inches type(ductile)was repaired in(Lazaka)that subordinate to(Misirike)complex.
To see more activities, visit our Facebook page:
https://www.facebook.com/dwod.duhok