info@dwod-dhk.org 009647514571426

Activities

Semel District Water Division

Activities

Semel District Water Division
Subordinate to directorate of water outskirts duhok governorate
Today On (5/10/2023)
The aforementioned division has completed works of:-

1- A pipe was repaired type(polyethylene)with a size of(90)mm in(shahidan)neighborhood,and a pipe was repaired with a size of(4)inches type(ductile)in(tanahi)complex and and a pipe was repaired with a size of(110)mm type(polyethylene)in(khanke)sub-district.
2- (6)samples of water were deliveried to the directorate of water outskirts duhok governorate for the purpose of examining them in the laboratory,(200)kg of(chlorine powder)were dilivered for(tanahi+zanku neighborhood+marina+batele+maqble village) and a(zanku neighborhood’s) chlorine machine was changed in semel district.
3- An electrical box was replaced for(Basdke)wells, replacing a motor with a size of(KW15),supplying a pipe with a size of(2.5)inches, replacing a(phase filler) for well numbered(2)in(smail ava)village,and replacing a(conductor)with a size of(80)Ampere for(hawshke)village’s well.
4- The main pipe was repaired for(hawrske)village’s well,a pipe with a size(4)inches was repaired in(batele)sub-district.

 

To see more activities, visit our Facebook page:
https://www.facebook.com/dwod.duhok

We take processes apart, rethink, rebuild, and deliver them back working smarter than ever before.