Today On (17/7/2023)
The aforementioned division has completed works of:-

1- An iron pipe was replaced type(polyethylene)and length(10)m with a size of(90)mm in(Balqous)complex,and a pipe was repaired type(polyethylene)with a size of(125)mm in(Smile Ava) village,and a pipe was repaired with a size of(4)inches in(Douban)neighborhood subordinate to semel district.
2- (6)samples of water were deliveried to the directorate of water outskirts duhok governorate for the purpose of examining them in the laboratory,(400)kg of(chlorine powder)were taken from directorate’s warehouses to water projects within the limits of the aforementioned division,and(200)kg of(chlorine)distributed to(Batele+Dolba well+Tob Zawa village+Bawarde village+Azadi neighborhood well)wells that subordinate to Semel district.
3- A lock with a size of(4)inches was repaired in(Kevla)village, and a pipe of size(6)inches was repaired type(ductile)in(Shahidan)neighborhood subordinate to Semel district.
4- A phase filler was replaced in(Khan Tor)village and a(switch starter)was replaced for(Kani Arab)village’s well ,and a cable with a size of(3*70+50)mm and a length of(36)m was replaced,with a replacement of(conductor)of a size of(80) amps and a(phase filler)with a size of(30/50)amps for the well number(1)in(Balqus)village.
5- An electricity network for the roof of the motors room was installed in(Shahidan)neighborhood water project in Semel district, with determining the locations of the electricity poles for the (Tanahi) complex using the (E surveyor gps)device.
6- An engine was replaced with a size of(15 kw)and pump(SP30-20 for the well numbered(2)in(Kole)village, with the replacement of circuit with a size of(80)ampere for well numbered(8)in semel district and chlorine filter was cleaned for Khanki water project.