Semel District Water Division
Subordinate to directorate of water outskirts duhok governorate
Today On (23/2/2023)
The aforementioned division has completed works of:-
1- A starter and a clamp with a size of(95)mm were repaired in (qruda)village,(6)samples of water were taken for the pupose of testing them in directorate of water outskirts duhok governorate.
2- A water pipe was repaired with a size of(90)mm type(polyethylene) in(khanke)sub-district,a water pipe was repaired with a size of(75)mm in(tanahi)complex,and a lock was repaired with a size of(3)inches in(siche)village.
3- Two type with a size of(10)inches were repaired in (msirike)complex’s water project,and two pipes were repaired with a size(180 and 125)mm in(khanke)sub-district,and three part of pipe were dilivered with a size of(4)inches in semel district,and two water lines were cuted in tanahi complex,concrete was made for the poster station hall in the Msirike water project.