The aforementioned division has completed works of:-

1- A pipe with(110)mm was repaired in the center of Sarsng sub-district,and a pipe with(3)inches was maintenanced in the center of Sarsng sub-district.
2- A set of submersible was replaced(7.5 kw)for(Tahlava)village’s well that subordinate to Bamarne sub-district.
3- A pipe with(125)mm and length(80)m was installed,and another pipe was installed with(90)mm and length(200)m for(Ashawa)village that subordinate to Sarsng sub-district.
4- Two chlorine pumps were maintenanced for wells numbered(1 and 3)in(Qadsh)complex that subordinate to Sarsang sub-district.
5- A pipe with(110)mm was maintenanced in(Barashe)village that subordinate to Chamanke sub-district.
6- A pipe with(75)mm was maintenanced in(Shrte)village that subordinate to Bamarne sub-district.
7- (50)kg of(chlorine powder)and(25)kg of(chlorine pills)were distributd for(Qadsh)complex and Bamarne sub-district water projects.