Today On (14/5/2023)
The aforementioned division has completed works of:-
1- Two sets of Submersible were replaced for the wells that locate in the center of (Daratu)sub-district ,well number(9)+(2)in(Palasan)village in(Ruviya)sub-district, consisting of (motor, pump and electricity board, and supplying three pipes for each of the wells).
2- A number of locks were replaced and maintenanced for the water network of(Shoresh)neighborhood in the center of Bardarash district and(pirchawsh,grbdaw and Zawi Rash)villages with two locks in the center of Darato sub-district.
3- A water network was installed in(Old grbdau)village in daratu sub-district,consisting of((100) meters of pipes with a size of (125) mm and (100) meters of pipes with a size of (75)mm).
4- A water network was maintenanced in(small Bardarash)neighborhood in the center of the district and(big Darbistan and big Jojar)villages in(ruviya)sub-districtand and(Korao and Zanganan)villages in daratu sub-district.
5- A number of electricity board were maintenanced for a number of wells in the center of Bardarash district and sub-districts of(Ruvia and Dartu)and the outskirts villages, and chlorine machine was maintenanced for well number(1)in the center of(Darto)sub-district and(dlejan)village’s well in ruviya sub-district.