The aforementioned division has completed works of:-

1- An electricity board(starter)was repaired for (golan)neighborhood’s project that subordinate to Sheladz sub-district.
2- A number of locks with a sizes of(180-250)mm were repaired in(Shahidan)neighborhood, a water line was installed with a length of(60)m and a pipe(63)mm, and a pipe(90)mm was repaired, and building a water dam in Gali Sherana that subordinate to Derluk sub-district.
3- A chlorine pumping machine was repaired in(mle maidane)well in the Sheladz sub-district, and taking(3)samples of water for the purpose of testing them, and a sample for the purpose of chemical examination and knowing the amount of chlorine inside the water within the boundaries of Amedi district.
4- A number of water pipes were repaired and maintenanced of with sizes of(90)mm in(Silav), and a pipe with a length of(100)m and size(63)mm was installed for(Braim Zla)village which subordinate to boundaries of Amedi district.