The aforementioned division has completed works of:-
1- The main water pipe was repaired with a size of(160)mm,and a lock was repaired with a size of(180)mm in(Piye shin)neighborhood that subordinate to Sheladz sub-district.
2- A lock was repaired with a size of(200)mm in(Dastan)neighborhood,and a pipe was repaired with a size of(63 to 200)in(Shahidan)neighborhood that subordinate to Deraluk sub-district.
3- (6)samples of water for biological examination and a sample for chemical examination were taken,and the amount of chlorine inside the water were tested within the borders of Amedi district,and all the motors for the projects between(Seri and Sheladz)were maintenanced.