The aforementioned division has completed works of:-
1- The main water pipe was repaired with a size of(110)mm,with a lock with a size of(25)mm in(Azadi)neighborhood that subordinate to Deraluk sub-district.
2- The sidewalk blocks were raised and re-installed,and a water pipe was repaired with a size of(200)mm in(Kurazhar)neighborhood that subordinate to Deraluk sub-district.
3- (100)kilos of(chlorine powder)were distributed for the joint project between(Seri+Sheladz),and(6)samples of water for biological examination and a sample for chemical examination were taken,and the amount of chlorine inside the water were tested within the borders of Amedi district.