Shekhan District Water Division
Subordinate to directorate of water outskirts duhok governorate
Today On (15/1/2023)
The aforementioned division has completed works of:-
1- A(4)inches(Ductile)lock was provided and replaced in the water network of the well number(13)in(golan)neighborhood in the center of Qasruk sub-district.
2- A starter was repaired,and a(circuit breaker)provided a replaced the well number(14)in the center of Kalakchi sub-district.
3- A water line and(check valve)were repaired with a size of(3)inches in water network of Atrush sub-district.
4- (7)samples were taken from water(6 biological and 1 chimical)for the pupose of testing them in the aforementioned directorate,and(400)kg of(chlorine powder) was taken for the projects that subordinate to the aforementioned division.
5- Two(4)inches(Ductile)locks were provided and replaced in(Haweriya and Shngaliya)neighborhood’s water network in the center of Baadri sub-district.
6- A motor’s starter was repaired for well of(Berstak and gwe galiye khude da)village of Sheikhan district.
7- Continuity with the works of water projects for((Bibuze, Drin, Kope)villages, and the center of Kalakchi and Baadre sub-district… etc.), which are being implemented on the budget of Dohuk Governorate within the boundaries of Sheikhan district.