Today On (25/10/2022)
The aforementioned division has completed works of:-

1- A (Ductile)lock with a size of(180)mm was provided and connected for the water line in the center of Faida sub-district , and two(polyethylene)lines with a size of(180)mm were repaired in the center of Faida sub-district.
2- A (Ductile)lock with a size of (110)mm was repaired in(Gambur)complex,and another(Ductile)lock with a size of (110)mm was repaired in(Kazg)village.
3- A cable(10*4)mm and length(15)m was replaced for(Zawa)well numbered(4).
4- (40)kg of(chlorine powder)were distributed for(zurava)village’s well,and another(40)kg of(chlorine powder)were distributed for faida’s well numbered(2).
5- (12)samples were taken from wells and projects that subordinate to aforementioned division for the purpose of testing them in the laboratory of directorate of water outskirts duhok governorate.

 