Faida Sub-district Water Division
Subordinate to directorate of water outskirts duhok governorate
Today On (15/10/2022)
The aforementioned division has completed works of:-
1- A water lock was repaired with a size of(160)mm,type(Ductile)in french dumiz project.
2- A main water line was repaired with a size of(300)mm,in(Bazalan)complex.
3- Two water lines were repaired with a size of(125+250)mm,in(Shariya)complex.
4- A damaged push button was replaced for pump numbered(2)in(Roj)project.
To see more activities, visit our Facebook page:
https://www.facebook.com/dwod.duhok